Calculate cubic yards, bags needed, and Colorado-accurate ready-mix costs for any Lakewood concrete project — driveways, patios, foundations, garage slabs, footings & more.

$162
Avg CO Ready-Mix (per Cu Yd)
4,000
Min PSI — Lakewood Exterior Flatwork
36 in
Frost Depth — Jefferson County CO
DORA
CO Dept of Regulatory Agencies
🚗 Driveway 🏠 Garage Slab 🛤️ Patio / Flatwork 🏗️ Foundation 🪨 Footings 🏢 Commercial Slab
The Lakewood CO Concrete Calculator helps homeowners, contractors, and builders estimate cubic yards, bag count, and ready-mix costs for any concrete project in Lakewood, Colorado. Situated at approximately 5,400 feet elevation in Jefferson County just west of Denver, Lakewood presents a unique set of concrete challenges: extreme temperature swings, intense UV radiation, low humidity, and — critically — highly expansive bentonite clay soils that are among the most damaging to concrete slabs and foundations in the entire country. All exterior flatwork in Lakewood requires a minimum of 4,000 PSI with 5–7% air entrainment to survive Jefferson County's freeze-thaw cycles. Ready-mix pricing typically runs $148–$185/yd in the Denver metro market. Colorado contractors are licensed through DORA (Department of Regulatory Agencies) — always verify at colorado.gov/dora. Enter your dimensions for instant CO-accurate results. Explore all tools at Concrete Toolkit.

🏔️ Lakewood CO Concrete Calculator

🏔️ CO-Accurate Pricing · DORA Compliant · Jefferson County · 5,400 ft
Lakewood CO Concrete Calculator
Cubic yards, bags needed & Colorado ready-mix cost — instant results
🚗 Driveway 🏠 Garage Slab 🛤️ Patio 🏗️ Foundation 🪨 Footings

Enter your project dimensions to calculate volume, bags needed, and estimated Lakewood CO material cost.

abel for="projectType">Project Type

Residential driveway: 5 in. min, 4,000 PSI with 5–7% air entrainment. Frost depth is 36 in. in Jefferson County — all footings must extend below this depth.

abel for="psiGrade">Concrete Strength (PSI)
abel for="dimLength">Length (feet)
abel for="dimWidth">Width (feet)
abel for="dimDepth">Depth / Thickness (inches)

Driveway 5 in · Garage 5–6 in · Patio 4 in · Foundation 6–8 in

abel for="wasteFactor">Waste / Overage Factor
Cubic Yards Required
—
Including waste factor

📋 Project Summary

    💵 CO Cost Estimate

      📐 Lakewood CO Driveway Cross-Section — Colorado High-Altitude Standard Layers

      Broom Finish — IBC / Jefferson County Standard · Control Joints Every 8–10 ft
      Concrete — 5 in. (Lakewood Driveway / Garage)
      4,000 PSI · 5–7% Air Entrainment · W/C ≤ 0.45 · #4 Rebar or WWF Mesh
      ⬛ #4 Rebar or 6×6 WWF Mesh — Required in Jefferson County Freeze-Thaw Zone
      🪨 4–6 in. Compacted Gravel / Crushed Stone Base (Critical Over Expansive Clay)
      ⚠️ Expansive Bentonite Clay Layer — Common in Jefferson County (Soil Testing Advised)
      Compacted Subgrade / CO Front Range Soils · Frost Depth 36 in. Below Grade
      27
      Cu ft per cubic yard
      45
      80 lb bags per cu yd
      $162
      Avg Lakewood ready-mix / yd
      Concrete Slab Rebar / WWF Gravel Base Expansive Clay Subgrade

      Lakewood CO Concrete Calculator — What You Need to Know

      Lakewood is Colorado's fifth-largest city, home to approximately 160,000 residents in Jefferson County on the western edge of the Denver metro area. Its location at the base of the Rocky Mountain foothills gives it a semi-arid, high-altitude climate with over 300 days of sunshine per year, dramatic temperature swings of 40–60°F in a single day, very low relative humidity, and a frost depth of 36 inches. These conditions create a set of concrete challenges distinct from either the Pacific Northwest or the Deep South: rapid surface evaporation causes plastic shrinkage cracking, intense UV radiation accelerates slab degradation, and expansive bentonite clay soils that expand when wet and shrink when dry can literally heave and crack slabs from below. Contractors in Colorado must be licensed through DORA — always confirm at colorado.gov/dora.

      🔵 Lakewood CO Minimum Concrete Requirements

      All Exterior Flatwork (driveways, patios, sidewalks): 4,000 PSI with 5–7% air entrainment — mandatory for Jefferson County freeze-thaw durability · Garage Floors: 4,000 PSI, 5–6 in. thick, vapor barrier recommended · Foundation Slabs: 4,000 PSI, 6–8 in., footings at 36 in. minimum depth · W/C Ratio: Maximum 0.45 for all exterior concrete · Curing: Wet-cure or apply curing compound immediately — Lakewood's low humidity and high altitude evaporate bleed water very rapidly · High-altitude note: At 5,400 ft, air entrainment targets differ slightly from sea-level mixes — confirm target air content with your ready-mix supplier · Expansive soils: A geotechnical report is strongly advisable before any foundation work in Jefferson County. Always confirm with City of Lakewood Building Division before any pour.

      🚗 Lakewood Driveway Concrete

      A standard 20×20 ft Lakewood driveway at 5 inches requires ~6.2 cubic yards of 4,000 PSI air-entrained concrete. Colorado's intense UV radiation makes surface sealers and proper curing even more important than in other states — an unsealed driveway will show surface scaling and color fading significantly faster at altitude. Control joints every 8–10 ft manage cracking from the large daily temperature swings. Basic broom-finish driveways run $9–$15/sq ft installed in the Jefferson County market, with stamped and decorative work reaching $20–$35/sq ft.

      🏠 Lakewood Garage Floor Concrete

      A standard two-car garage (20×22 ft) at 5 inches needs ~6.7 cubic yards of 4,000 PSI concrete. Lakewood winters bring road salt from driveways and streets into garages on tires — use a W/C ratio of 0.45 or lower and apply a quality penetrating sealer after the slab reaches full cure (28 days) to protect against chloride penetration. A vapor barrier under garage slabs is recommended even in Colorado's dry climate — Jefferson County soils can deliver moisture upward during wet spring seasons. Epoxy coatings are extremely popular in the Denver metro due to the dry climate that promotes good adhesion.

      🏗️ Lakewood Foundation & Expansive Soils

      The single greatest concrete risk in Lakewood is expansive bentonite clay soil, which is widespread across the Denver-Front Range area including Jefferson County. These soils can expand up to 10% in volume when saturated — generating uplift pressures capable of cracking foundation slabs, breaking footings, and buckling basement walls. A geotechnical report from a licensed CO geotechnical engineer is not optional for any significant foundation in Lakewood — it is essential. Mitigation options include moisture-conditioned subgrade, structural slabs on piers, and void-form systems that allow soil expansion without transferring force to the slab.

      How to Calculate Concrete in Lakewood CO

      Measure your project's length and width in feet and thickness in inches. Multiply length × width × (thickness ÷ 12) to get cubic feet, then divide by 27 for cubic yards. Always add at least a 10% waste factor — Lakewood's low humidity and wind can cause concrete to stiffen faster than expected in warm months, making mid-pour delays more costly. For any project where subgrade soil has been disturbed, ensure it is fully re-compacted before ordering concrete. For foundations, always confirm your geotechnical report's recommendations before finalizing thickness and reinforcement.

      📐 Lakewood CO Concrete Volume Formula

      Volume (cu ft) = Length (ft) × Width (ft) × [Thickness (in) ÷ 12]
      Volume (cu yd) = Volume (cu ft) ÷ 27
      Order Qty = CEIL[ Volume (cu yd) × Waste Factor ]
      Example: 20 ft × 20 ft driveway × 5 in = 166.7 cu ft = 6.17 cu yd → Order 6.8 cu yd

      ⚠️ Lakewood High-Altitude & Low-Humidity Concrete Warning

      At 5,400 feet elevation, Lakewood's low humidity (often 15–30%), frequent afternoon winds, and intense sun create extremely high evaporation rates from fresh concrete surfaces. When the evaporation rate exceeds the bleed water rate — which happens very quickly in Lakewood's climate — plastic shrinkage cracks form across the surface within the first hour of placement, before any finishing is complete. To prevent this: schedule pours for early morning when temperatures are lower and humidity is higher; use evaporation retarder (Confilm or equivalent) immediately after screeding; erect windbreaks on windy days; begin curing with wet burlap or curing compound as soon as the surface can bear it. The evaporation rate nomograph in ACI 305 should be consulted for any hot-weather or windy-day pour in Lakewood. Never let the surface dry or "check" before final finishing is complete.

      Lakewood CO Concrete Cost Breakdown by Project Type

      The table below reflects typical volumes and current Jefferson County ready-mix pricing for the most common project types. Installed costs include forming, standard labor, broom finish, and control joints — they exclude excavation, permits, geotechnical reports, vapor barriers, and specialty admixtures for expansive soils. Denver metro labor costs are moderate. Always collect at least three bids from DORA-licensed Lakewood concrete contractors before committing to any project.

      Project Type Typical Size Thickness Cu Yards Material Cost Installed Estimate Notes
      Driveway (Standard) 20 × 20 ft 5 in. ~6.2 yd $1,004 $2,300 – $3,600 4,000 PSI + Air
      Garage Floor (2-car) 20 × 22 ft 5 in. ~6.7 yd $1,085 $2,500 – $3,900 4,000 PSI + Air
      Patio / Backyard Slab 16 × 20 ft 4 in. ~4.7 yd $761 $1,650 – $2,600 4,000 PSI + Air
      Foundation Slab 1,500 sq ft 6 in. ~18.5 yd $2,997 $9,500 – $16,000 4,000+ PSI · Geotech
      Sidewalk / Walkway 4 × 40 ft 4 in. ~2.0 yd $324 $800 – $1,500 4,000 PSI + Air
      Commercial / Warehouse 40 × 60 ft 6 in. ~44.4 yd $7,193 $19,000 – $32,000 4,000–5,000 PSI

      🚗 Driveway (Standard) — 20×20 ft

      Thickness5 in.
      Cubic Yards~6.2 yd
      Material Cost$1,004
      Installed Estimate$2,300 – $3,600
      PSI / Air4,000 PSI + Air

      🏠 Garage Floor (2-car) — 20×22 ft

      Thickness5 in.
      Cubic Yards~6.7 yd
      Material Cost$1,085
      Installed Estimate$2,500 – $3,900
      PSI / Air4,000 PSI + Air

      🛤️ Patio / Backyard Slab — 16×20 ft

      Thickness4 in.
      Cubic Yards~4.7 yd
      Material Cost$761
      Installed Estimate$1,650 – $2,600
      PSI / Air4,000 PSI + Air

      🏗️ Foundation Slab — 1,500 sq ft

      Thickness6 in.
      Cubic Yards~18.5 yd
      Material Cost$2,997
      Installed Estimate$9,500 – $16,000
      PSI / Notes4,000+ PSI · Geotech

      🚶 Sidewalk / Walkway — 4×40 ft

      Thickness4 in.
      Cubic Yards~2.0 yd
      Material Cost$324
      Installed Estimate$800 – $1,500
      PSI / Air4,000 PSI + Air

      🏢 Commercial / Warehouse — 40×60 ft

      Thickness6 in.
      Cubic Yards~44.4 yd
      Material Cost$7,193
      Installed Estimate$19,000 – $32,000
      PSI Grade4,000–5,000 PSI

      Lakewood Expansive Soils & Colorado Front Range Conditions

      Jefferson County sits on the eastern edge of the Rocky Mountain uplift zone, where bentonite-rich clay soils and claystone bedrock are extremely common — especially in the lower-elevation residential areas of Lakewood. These soils are classified as highly expansive with swell potential often exceeding 5–10% when moisture content changes. The damage pattern is characteristic: wet spring seasons cause soils to expand and push slabs upward; dry summers cause the same soils to shrink and create voids under the slab, which then cracks when loaded. Mitigation is far less expensive than repair — always invest in a geotechnical investigation before any foundation, retaining wall, or large flatwork project in Lakewood.

      ☀️ Lakewood UV, Heat, & Rapid-Evaporation Concrete Tips

      Lakewood's high elevation means UV intensity is roughly 25% higher than at sea level — concrete surfaces cure faster and are more susceptible to surface cracking without proper curing. Apply a curing compound or begin wet curing within 20–30 minutes of finishing — far sooner than you would at sea level. Avoid pouring in direct afternoon sun during summer when concrete surface temperatures can reach 90–100°F before finishing is complete. On windy days, use windbreaks to reduce evaporation. Do not add water to the mix at the job site to make it more workable — this destroys strength and increases cracking. If slump is too low on hot days, ask your ready-mix supplier for a mid-range water reducer admixture rather than adding water.

      Lakewood CO Concrete Calculator — Frequently Asked Questions

      What PSI concrete do I need for a Lakewood CO driveway? +
      All exterior concrete in Lakewood — driveways, patios, sidewalks, and garage floors — should use a minimum of 4,000 PSI with 5–7% air entrainment. The air entrainment is required for freeze-thaw durability. Interior slabs not exposed to freeze-thaw or de-icing chemicals can use 3,000–3,500 PSI without air entrainment. At Lakewood's 5,400 ft elevation, air entrainment metering behaves slightly differently than at sea level — always inform your ready-mix supplier of the elevation and confirm the target air content and mix design for your specific project.
      How much does ready-mix concrete cost in Lakewood CO? +
      Ready-mix concrete in Lakewood and the Denver metro area typically ranges from $148 to $185 per cubic yard for standard residential mixes. Air-entrained 4,000 PSI mixes for driveways fall in the middle of that range. Short-load fees for orders under 3 yards typically run $175–$275 in the Jefferson County market. Installed concrete flatwork averages $9–$15 per sq ft for broom finish and $20–$35/sq ft for stamped or decorative work in the Lakewood market.
      How do expansive soils affect concrete slabs in Lakewood? +
      Expansive bentonite clay soils are extremely common in Jefferson County and across the Denver Front Range. These soils swell dramatically when wet and shrink when dry, applying enormous forces to concrete slabs and foundations from below. The result is characteristic heaving, cracking, and settlement patterns. Mitigation options include: proper subgrade moisture conditioning before pouring; a structural slab supported on piers (bypasses the expansive layer entirely); void-form cardboard systems that allow soil expansion without transferring force to the slab; and thorough compaction of imported non-expansive fill. A licensed Colorado geotechnical engineer can evaluate your specific site and recommend the appropriate solution.
      How deep do footings need to be in Lakewood CO? +
      All footings in Lakewood and Jefferson County must extend at least 36 inches below finished grade per the Colorado frost depth requirement under the International Residential Code (IRC) as adopted by Colorado. This is shallower than the Great Lakes region but significantly deeper than the Pacific Coast. Beyond frost depth, footing design in Lakewood must also account for expansive soil conditions — a standard spread footing may not be appropriate depending on site soils. Always confirm current depth requirements with the City of Lakewood Building Division and consult a geotechnical engineer for all foundation work.
      Do I need a permit for concrete work in Lakewood CO? +
      The City of Lakewood Building Division requires building permits for structural concrete work including foundations, footings, retaining walls, and most slabs above certain size thresholds. Smaller patios and walkways may be exempt but rules vary. Colorado also requires that contractors performing construction work hold a valid DORA-registered contractor license. Always check with the City of Lakewood Building Division at lakewood.org before starting any concrete project to confirm permit requirements and avoid fines or required demolition.

      Lakewood CO Concrete & Code Resources

      Confirm permit requirements, geotechnical conditions, and frost depth before any Lakewood pour.

      🏛️

      City of Lakewood Building Division

      Permits & Inspections

      Check permit requirements, inspection schedules, and IBC/IRC concrete specifications for residential and commercial projects in Lakewood. The Building Division handles flatwork, foundation, and structural concrete permits and can advise on Jefferson County expansive soil requirements and IBC-adopted Colorado amendments applicable to your project.

      Visit City of Lakewood
      🧱

      Colorado DORA — Contractor Licensing

      Contractor Verification

      Verify licenses and complaint history for any concrete or construction contractor working in Lakewood. Colorado's DORA maintains a public license lookup for all registered contractors and electricians — always confirm your contractor's status before signing a contract. Also confirm the contractor carries current liability insurance and workers' compensation coverage for work in Jefferson County.

      Search DORA
      📘

      ACI 305 Hot Weather Concreting

      High-Altitude / Low-Humidity Guide

      ACI 305 Hot Weather Concreting is essential reading for all Lakewood summer concrete work. It covers evaporation rate calculations, evaporation retarder use, windbreak requirements, and mix design modifications for hot, dry, high-altitude conditions. The evaporation nomograph in ACI 305 should be consulted before every warm-season pour in Lakewood to determine if special precautions are needed.

      Concrete Toolkit